One of the first orders of business for Ottawa’s planning and housing committee in the new year will be approving an application to support the development of a new suburb in Ottawa’s south end with up to 17,000 new homes and 45,000 residents. Taggart Investments has filed an Official Plan Amendment application to implement the Tewin Secondary Plan for the area bounded by Leitrim Road, Ramsayville Road, Anderson Road, Farmer’s Way and Thunder Road in Osgoode Ward. Tewin is a partnership between Taggert Group, Caivan Communities and the Algonquins of Ontario, with 838 hectares of land on the property. “The scale of Tewin presents a once-in-a-generation opportunity to create one of the world’s most innovative, respectful, and sustainable new communities by: advancing best practices and demonstrating leadership in sustainable design and smart, suburban growth; delivering all that is required to create a vibrant, integrated, and resilient 15-minute community, including being built around transit and active mobility from Day-1; and advancing the vision and objectives of the City of Ottawa’s Official Plan,” says the planning rationale report, submitted by Urban Strategies Inc. The report says the amendments will enable Taggart and its partners to implement a new Secondary Plan for 445.35 hectares within the Tewin area. The original plan called for 14,100 to 17,400 new homes for up to 45,000 residents on 445.35 developable hectares of land. The Planning Rationale report submitted with the Official Plan Amendment says another 169 hectares of land could support development for an additional 6,000 to 7,300 units and an additional 15,900 to 19,500 residents. City staff say the application for the Official Plan Amendment would establish urban land use designations, address the Future Neighbourhood Overlay, and introduce area-specific policies and schedule amendments to the Official Plan, which will include the implementation of the Tewin Secondary Plan. City staff say the Tewin plan aims to “guide the development of the area into a sustainable, connected and complete 15-minute community based on Algonquin place keeping and design principles.” “The Tewin Secondary Plan area will be limited to a net developable area of 445.35 hectares, while the Tewin Community Design Plan applies to the entire 838-hectare Study Area,” staff said. “Net developable area refers to land that can be developed to contribute to population growth within the Secondary Plan and is not constrained by existing or future natural areas, public or private infrastructure, or utility uses. The applicant has requested that the Future Neighbourhood Overlay be partially removed from the subject lands from the net developable area of 445.35 hectares only. The remainder of the 838-hectare study area will remain under the Future Neighbourhood Overlay with new policies that speak to conditions that must be satisfied before the overlay can be considered lifted for future growth.” Tewin’s plan includes three neighbourhood centres “support daily and high-density living,” a “dense community corridor that activates the Community Spine to support transit” and “distinct neighbourhoods offering a range of housing options. The plan calls for 60,000 sq. m. of commercial space, 34 hectares of parkland, 30 kilometres of trails and up to 14 schools. The report by Urban Strategies says Tewin will be developed over the next 20 years, “beginning in and around the Community Core and moving west and south from there in a contiguous manner.” “Thoughtful phasing of development and key infrastructure is required throughout this trajectory to ensure Tewin will always be a place that is compact, connected, and livable, and will deliver on its vision with each stage of development,” the report said. “This means a range of housing options, open spaces, services, amenities, and streets supporting all modes of travel will be delivered at each stage, with variation in the type and extent of these elements based on the location and timeframe of each phase of development.” According to the planning rationale report, the Tewin Secondary Plan will establish the foundations for a “comprehensive mobility network that supports transit and embeds active mobility in a meaning full way.” “New streets and trails will be planned and designed according to their context and the role they play within Tewin’s Mobility Network. Rather than attempting to serve all travel modes within every right-of-way and trail, which can result in trade-offs and less efficient use of land, development of Tewin will prioritize transit and active modes on a subset of streets and trails.” The application includes the Secondary Plan, strategies for mobility and maps for the community. Staff say they are targeting early 2027 for councillors on the planning and housing committee to debate the Tewin Official Plan Amendment.