The Peter Hemingway Aquatic Centre will reopen on Tuesday after being closed for months due to flooding. The pool, a designated historic resource, first opened in 1970. It was closed in 2020 and reopened in January. Six months later, it was closed again due to “extreme weather.” The city said on Friday that the pool needed waterproofing and drainage work, as well as restoration after flooding in the surrounding Coronation Park. “Edmonton recorded its wettest summer on record with 563 mm of rain, over three times the volume seen in 2025. Staff worked very hard to get our aquatic centre back up and running again,” said Brad Badger, city director of physical activity and sports centres. The west Edmonton pool connects to Coronation Park Sports and Recreation Centre and welcomes 600 to 800 visitors daily. The city said it is working with EPCOR on long-term mitigation strategies for the area.