The province is warning drivers of a large, slow-moving load that will leave Edmonton on Saturday on route to Strathcona County. Because of its size, the EO reactor, used in the oil refining process, can’t travel faster than 30 km/h and will use the entire width of the highway, including the shoulder. Officials say the load will sometimes travel against the flow of traffic with lanes blocked off accordingly. The EO reactor is 9.8 metres wide, 9.3 metres high and 141 metres long and weighs 1,600,000 kilograms. There are 832 wheels on the trailers being used to transport the equipment. The equipment will leave Dacro Industries Inc. in south Edmonton on Saturday night and travel for three nights to reach the Shell Scotford Complex. The route is as follows: Day 1 Jan. 25 (Night Move) Day 2 Jan. 26 (Night Move) Day 3 Jan 27 (Day Move)